Logo of Phnom Penh Post newspaper Phnom Penh Post - Sesan residents settle on new relocation site

Sesan residents settle on new relocation site

Homes in Srekor village were dismantled in April in anticipation of flooding caused by the Lower Sesan II dam.
Homes in Srekor village were dismantled in April in anticipation of flooding caused by the Lower Sesan II dam. Eliah Lillis

Sesan residents settle on new relocation site

Over a hundred families in Stung Treng province’s Srekor and Kbal Romea communes said yesterday that they have located around 2,000 hectares to relocate to when a scheduled test run for the Lower Sesan II dam this week leaves their villages flooded.

The villagers have refused compensation to relocate to resettlement sites for people affected by the controversial dam and were at risk of seeing their villages submerged when the dam’s doors are closed on July 15 for technical checks. The dam is scheduled to be inaugurated in September.

Dam Samnang, a community representative for Kbal Romea, said the villagers had found around 2,000 hectares of land above the expected flood line and 5 kilometres from their current villages.

“That hill will not be flooded, so the people see it as a safe place. About 50 homes and huts have [already] been built there,” Samnang said, adding that location had forests as well as land for farming.

A man rides past houses under construction at a relocation site for villagers affected by the Lower Sesan II dam in Stung Treng province in 2015.
A man rides past houses under construction at a relocation site for villagers affected by the Lower Sesan II dam in Stung Treng province in 2015. Heng Chivoan

Yet he said he was concerned about villagers who had few resources to relocate their lives and possessions to the new site, and required some assistance.

The villagers have also opposed the dismantling of the 252-metre Sre Pok Bridge ahead of the dam test, saying they would be cut off if it were removed.

Sar Kimnat, director of the provincial Public Works and TransportationDepartment, said his officials will meet with villagers today and would assist them in their move starting Wednesday, but that the bridge would still be removed.

MOST VIEWED

  • Tensions high ahead of historic Kun Khmer match up

    The long-awaited November 5 matchup between Kun Khmer legend Prum Samnang and Myanmar-Canadian boxer Dave Leduc has become the most anticipated fight of the year. The Wurkz Sena Kun Khmer promotion, which will be held at the Town Arena at Chip Mong 271 Megamall, will see six

  • Manet: Cambodia safe for travel

    Prime Minister Hun Manet acknowledged that Cambodia and China have cooperated to tackle internet scamming, fraud and other cross border crimes, but insisted that the “Kingdom of Wonders” is completely peaceful and safe. He welcomed tourists to come and explore its rich heritage. During a

  • UNESCO formally list Battambang gastronomy

    Battambang, renowned for its cultural heritage, has achieved a significant milestone as the first Cambodian municipality to join the UNESCO Creative Cities Network (UCCN). The UCCN unites nearly 300 cities prioritising creativity and cultural industries in local development plans and international cooperation. On World Cities Day,

  • Cambodia pivots to solar, wind energy

    Cambodia is planning a move towards solar and wind energy to meet its rising power demands, according to Minister of Mines and Energy Keo Rottanak. On the sidelines of the Singapore International Energy Week event held recently, Rottanak emphasised the urgency of diversifying Cambodia’s

  • Angkor causeway symbol of Cambodia-Japan ties

    In a historic moment marking another milestone in the 70-year-long diplomatic relations between Cambodia and Japan, King Norodom Sihamoni celebrated the formal inauguration of a causeway located to the west of the world-renowned Angkor Wat. While presiding over the November 4 ceremony, the King emphasised the

  • Manet calls for Cambodia’s railways to get back on track

    Prime Minister Hun Manet has instructed the relevant authorities to expedite studies into upgrades to the Phnom Penh to Preah Sihanouk railway line. He suggested that the maximum speed on the line should be increased to 80km/h, in order to expedite the transportation of